Aerial view of a SolidWurth-built agri-industrial facility — main plant, loading area, and wastewater treatment, framed by mountain landscape
Turnkey Agri-Industrial Construction · Philippines

We build the facilities that feed the nation.

SolidWurth Corp. delivers agri-industrial facilities across the Philippines — from feasibility study through first production shift, and beyond. Permits, financing documents, design, construction, and operations support under one accountable team.

2019
Established
9,000BPH
Dressing Plant · Up To
5ML/day
Wastewater Treatment · Up To
3groups
Luzon · Visayas · Mindanao
What We Deliver

Full lifecycle. One accountable team.

We engage long before the first drawing and stay through commissioning. Six services across the project arc — so you deal with one team, not five.

Project Development & Financing

Feasibility studies, project proposals, and the financing documents your bank or financier needs to underwrite the build. We help you make the case before construction starts.

Permitting & Compliance

DENR Environmental Compliance Certificates, FDA and NMIS sanitary permits, LGU clearances. We assemble the compliance package that gets your facility approved without stalling the schedule.

Design & Build

Architecture, engineering, and construction under a single contract. We translate operational requirements — throughput, biosecurity, refrigeration — into facilities that perform on day one.

Project Management

Schedules that hold, budgets that hold, contractors that hold. Our PMs run the site, manage the trades, and report to you in real numbers — not promises.

BOQ & Estimates

Detailed bills of quantities and cost estimates grounded in current Philippines material rates — so the proposal you receive is the budget you actually build to.

Construction Services

Civil works, structural steel, mechanical and electrical installation, refrigeration systems, and wastewater treatment integration — executed by skilled crews under direct supervision.

Facility Types

Built for the food supply chain.

Specialized infrastructure for the agri-industrial sector — from live-bird intake to processed-product cold chain.

Poultry Dressing Plants
1,000 to 9,000 BPH lines, full process flow
Hog/Cattle Slaughterhouses
Sanitary-grade design, NMIS-compliant flow
Ice Plants & Cold Storage Facilities
Insulated panels, refrigeration integration
Wastewater Treatment
DENR-compliant systems for plant effluent
Poultry Farms (Layer, Broiler, Breeder)
Tunnel-ventilated, biosecure layout
Swine Farms
Biosecure layout, climate-controlled housing
Selected Projects

Plants already running.

A snapshot of completed and in-progress agri-industrial work across the Philippines.

Poultry dressing plant exterior
Poultry Dressing

Poultry Dressing Plants

Various Philippines locations
Monkayo 3600 BPH poultry dressing plant
Poultry Dressing

Monkayo 3600 BPH Plant

Inambatan, Monkayo · Davao de Oro
Pantukan tunnel-ventilated broiler farm interior
Broiler Farm

Pantukan 40K Broiler Growing Farm

Pantukan · Davao de Oro
Wastewater treatment storage tanks at sunrise
WWT Facility

Wastewater Treatment Systems

Integrated across multiple plant sites
Multi-section slaughterhouse facility
Slaughterhouse

Sanitary-Grade Slaughterhouse Works

Various Philippines locations
Aerial view of multi-building broiler farm complex
Broiler Complex

Multi-Site Broiler Farm Builds

Multiple regions
How We Work

Four stages, one engagement.

From the first feasibility conversation through the first production shift — we stay with the project end-to-end.

Plan & Permit

We start before construction. Feasibility studies your bank can underwrite, project planning, and the regulatory permits — DENR, FDA, NMIS, LGU — that get your facility approved. You walk into ground-breaking with the paperwork done.

Design & Engineer

Our architects and engineers work with you to translate operational requirements — throughput, biosecurity, refrigeration, regulatory clearances — into drawings that match the production reality you're building toward.

Build & Commission

Civil, structural, mechanical, electrical, refrigeration, and wastewater systems executed under direct supervision. We hand over a working facility — built to the throughput targets in the spec, ready for first production shift.

Operate & Support

After handover, we can stay on — as operations consultants advising your team, or under a full management contract running the facility for you. The choice depends on whether you're an operator or an investor.

After Handover

Need someone to run it, too?

Most contractors disappear at handover. We can stay on — as advisors to your operations team, or under a full management contract running the facility for you.

Advisory

Operations Consulting

Senior advisory for your in-house operations team. Throughput optimization, biosecurity programs, refrigeration efficiency, regulatory continuity, and continuous-improvement programs grounded in the operator background SolidWurth was built on.

Best For Operators who run their own teams but want senior advisory on production performance, compliance, and continuous improvement.
Full Service

Facility Management & Operations

We run the plant under a management contract — staffing, production scheduling, biosecurity, compliance reporting, maintenance, and continuous improvement. You receive monthly performance reports against agreed throughput and quality targets.

Best For Investors or asset owners who want the facility run end-to-end without building an in-house operations capability.
About SolidWurth

Built by engineers who've designed the plants — and operated them.

SolidWurth Corp. was established on 14 October 2019 by Jonathan Profugo — a manufacturing engineering management graduate of De La Salle University-Taft. Before founding the company, Jonathan spent years at a leading agri-industrial equipment manufacturer, designing and commissioning poultry dressing plants, slaughterhouses, wastewater treatment systems, and custom-fabricated equipment for clients across the Philippines.

That dual exposure — engineering the build, then standing alongside operators as the plant came online — shapes how we engage at every stage. Before construction, we know which financing numbers a bank will scrutinize, which DENR and NMIS clearances will stall a schedule if filed out of order, and which feasibility assumptions an investor will challenge. During design and build, we engineer for the production reality — not just structural integrity. After handover, we can stay on as advisors to your team, or run the facility ourselves under a management contract.

We work across the Philippines on poultry dressing plants, hog and cattle slaughterhouses, cold storage, farms, swine facilities, and wastewater treatment systems. Our clients are operators and investors who'd rather work with one accountable team across the full project arc than coordinate five different vendors with five different motivations.

"Our clients have plants to run and businesses to manage. They don't have time to chase five vendors with five different motivations. So they hired us to be the only call they make." Jonathan Profugo · CEO, SolidWurth Corp.
Our Guiding Principle
Solid Work,
Value with Worth.
Start a Project

Let's build the next one.

Tell us about your project — site, scope, target capacity, timeline. We'll respond within two business days with a path forward.

Office
Door No. 6, RIVIA Bldg., Diversion Road
Brgy. Conel, General Santos City 9500
Philippines
View on Google Maps →
Hours
Mon–Sat · 8:00 AM – 5:00 PM PHT